HV (3Cx300mm2/240mm2 - 11kV Cabling Laying) cabling work

LV (4Cx300mm2-4mm2) Cable laying works

Excavation and Backfilling of trenches

Supply and Installation of uPVC Ducts

Interlock Tiles reinstatement works

Cable Slewing / Diversion / lowering / raising / removal

Feeder Pillar Installation including installation of Earthing system

Supply and Installation of HV (11kV) and LV Cables Jointing and Termination

Supply and Installation of HV & LV Switchgears, Shifting of Transformers and RMU’s and Package Substations

Installation of Street Lights

Testing and Commissioning of Cables, Switchgears and Transformers

Supply and Installation of LV Switchgears / MDB / SMDB and DB Feeder Pillars/ Main Distribution Panels

Cable Pulling in trays – dressing with cleats and ties (nylon and steel)

Cable Glanding and Termination

DB Dressing